Findup Sports
Main content

OEM & Private Label · Cap Encyclopedia

OEM Cap Manufacturing

OEM cap manufacturing is the full-service path — brand supplies tech pack and artwork, factory sources fabrics, prepares patterns, cuts moulds, samples, produces and packs. Every step has a realistic timeline and a cost. Here's the playbook.

Programme MOQ
300 pcs
Per style / colourway
Sampling
10–15 days
Digital → PP sample
Bulk lead time
45–60 days
After PP approval
QC standard
AQL 2.5
Pre-shipment inspection

The full OEM workflow

  • 1. Tech pack review — the factory audits construction, fabric spec, trims, decoration and packaging.
  • 2. Costing — RFQ returned per silhouette / colourway / decoration combination with FOB and EXW pricing.
  • 3. Digital mock — 3D or flat mock with all artwork positions before physical sampling.
  • 4. Pre-production (PP) sample — physical cap in bulk fabric with final decoration. Approve for bulk.
  • 5. PO + deposit — usually 30% deposit, 70% against B/L.
  • 6. Bulk production — cutting, embroidery, assembly, closure, QC.
  • 7. Pre-shipment inspection (AQL 2.5) — third-party or in-house.
  • 8. Packing and freight — polybag, hangtag, carton, then FOB Karachi or air freight sample lot.

What to include in a cap tech pack

  • Silhouette reference and construction (6-panel structured, 5-panel unstructured, trucker, dad hat, etc.).
  • Crown fabric spec — fibre content, weight, colour Pantone reference.
  • Visor spec — flat or curved brim, insert grade, stitch row count.
  • Buckram grade for structured crowns (medium / heavy).
  • Closure — snapback (7 or 9 snap), buckle, hook-and-loop, elastic, fitted (no closure).
  • Sweatband — cotton twill, terry or PU.
  • Decoration — vector art files, Pantone references, stitch method or patch spec, position and size.
  • Labels and trims — main label, size label, care label, hangtag.
  • Packaging — polybag, cap-shaper insert, carton pack quantity.

MOQ by construction

StyleStandard MOQNotes
Snapback / dad hat (standard fabric)300 / colourwayOne-size construction
Trucker (foam + mesh)300 / colourwayCheapest FOB
Fitted cap (8 sizes)600 / colourwaySize-run drives higher MOQ
Custom fabric colour / dye1,200+Fabric mill minimum
PVC patch cap300Plus one-time tooling
Sublimated cap100–200No plate tooling

Lead time breakdown

  • Digital mock: 2–3 days from tech pack.
  • PP sample: 10–15 days (fabric sourcing usually the gating item).
  • Bulk production: 30–45 days after PP approval.
  • QC + packing: 5–7 days.
  • Freight to EU/US port: 25–35 days sea; 5–7 days air.

Where OEM programmes lose time

  • Vague tech pack — the factory has to guess and iterate. Send exact fabric weights and Pantone codes.
  • Late artwork changes — every artwork change after digitising resets the embroidery step.
  • Fabric colour dyeing — custom colours need mill lead time; use stock colours if possible.
  • Label / trim sourcing — main labels from a specific supplier can add 2 weeks. Consolidate suppliers.
  • Freight booking — sea container consolidation slots need booking at PP-approval stage.

Payment & Incoterms

  • Deposit: 30% at PO, 70% against B/L copy pre-shipment.
  • Incoterms: FOB Karachi is standard; EXW available for consolidators; DDP possible for larger programmes.
  • Currency: USD or EUR. Bank charges outside remitter's country are for the beneficiary unless agreed.
  • Sampling: sampling cost is usually credited against the first bulk PO.

Ready to run your first OEM cap PO?

Send the tech pack and target quantities — we'll return a costed quote and a sampling schedule inside 48 hours.

Request a quote